home *** CD-ROM | disk | FTP | other *** search
/ Ron Blank & Associates 7 / Ron Blank & Associates 7.iso / big03a / big03a57.png < prev    next >
Portable Network Graphic  |  2003-07-24  |  18KB  |  700x525  |  8-bit (138 colors)
Labels: crt screen | dialog box | monitor | plant | stairs | window
OCR: Pre-molded bell footings Overview Testing pre-molded bell footings History of footings Development of ithe Vertical testing: Conducted By:PSC Analytical Services Bell Footing Mechanical T esting Services Group Pre-molded bell Testing: footings The concrete was to set tup for over week and then the load tests were Review conducted vertical force was applied to each or the above looting systerms using References portable hydraulic ram as shown ir Fiqure 2 The load was measured and recorded using a 50 kip load cell digital data acquisition capabilties TEST Results The loads required to pull the systerms from the ground are given in the table below Load Measurements Systern Description Load Obtained (lbs.] 24 pre molded bell footing 8 tube 5700 pre molded bell footing8 tube 6100 24 pre molded ...